يفتح في علامة تبويب جديدة

10.2 MW Agrivoltaic Solar Project with Tracker Technology

الدولة
إيطالياإيطاليا
القطاع
Renewable energy
رقم الإعلان
L#20261189
السعر المستهدف
السعر عند الطلب
الإيرادات
€1,700,000
EBITDA
سيُعلن لاحقاً

الوصف

The Project has a grid injection capacity of 10.2 MW and a current design of c. 12.7 MWp, using bifacial modules on single-axis trackers combined with continued agricultural use of the land.

The Project is being authorised through the Simplified Authorisation Procedure (PAS) at municipal level: the application was filed with the municipal One-Stop Shop (SUAP) in July 2026 and the supplementary town-planning documentation requested by the municipality was submitted in September 2026. The grid connection solution issued by Terna provides for a 150 kV antenna connection to a new switching substation of the national transmission grid. The opportunity suits IPPs, infrastructure and energy-transition funds and industrial investors seeking a mid-size, advanced-stage Italian solar asset.

INVESTMENT HIGHLIGHTS

Efficient permitting route

PAS is a simplified municipal procedure; the SUAP receipt (August 2026) sets a 30-day term after which silence of the competent administration is equivalent to approval. The supplementary documentation requested in September 2026 has already been filed.

Direct HV grid access

Terna connection solution (STMG) with a 150 kV underground cable in antenna to a new 150 kV RTN switching substation, inserted in-out on an existing 150 kV line; dedicated 30/150 kV user substation within the site.

High-yield technology

single-axis E-W trackers with 650 Wp bifacial N-type modules and SMA central inverters, in one of Italy’s stronger solar-resource regions.

Secured, simple land base

the plant sits on a single cadastral parcel with one owner, under a preliminary purchase agreement; the cable route crosses only a few private parcels (easements) and farm roads, with modest estimated compensation.

Mature engineering

electrical design report with cable sizing and electromagnetic-field assessment (March 2026), detailed expropriation/easement parcel plan (July 2026) and a full PAS design package (landscape, constraints and planning studies).

Supportive market

Italy’s National Energy and Climate Plan (PNIEC) targets c. 80 GW of installed solar PV by 2030; agrivoltaic layouts are favoured by Italian energy and land-use policy.

KEY PROJECT DATA

Location Lazio region, Central Italy (province north of Rome); agricultural area at c. 160 m above sea level, reached via a farm road off a state road
Technology Agrivoltaic, ground-mounted; single-axis E-W trackers (N-S axis); bifacial monocrystalline N-type modules (650 Wp)
Capacity 10.2 MW grid injection; 12.727 MWp DC (rated capacity 10.67 MW per the parcel plan)
Main equipment (current design) 19,580 modules; 3 SMA Sunny Central UP central inverters (2 × 3,060 kVA + 1 × 4,200 kVA) in MV power stations; 30 kV MV network; 30/150 kV user substation
Site Single cadastral parcel of c. 17.3 ha project area (c. 14.3 ha occupied by the plant, including mitigation areas, roads and fencing); currently cereals and forage, to be replaced by crops defined in an agronomic plan
Grid connection Terna STMG: 150 kV underground cable in antenna to a new 150 kV RTN switching substation, inserted in-out on an existing 150 kV line
Land rights Plant parcel: preliminary purchase agreement with the sole owner. Cable route: easements over c. 5 private parcels (c. 1.2 km, c. 2,500 m² of easement strip; estimated compensation c. €2k) plus farm roads
Permitting route Simplified Authorisation Procedure (PAS) – municipal SUAP/SUE
Incentives Route to market through merchant sales and/or PPA (eligibility for support schemes to be assessed by the buyer)

DEVELOPMENT STATUS & MILESTONES

March 2026 Electrical design and electromagnetic-field report completed
July 2026 PAS application filed with the municipal One-Stop Shop (SUAP); parcel plan issued
August 2026 SUAP receipt issued (30-day term for silent consent)
September 2026 Municipality requests re-filing of the town-planning documents on its building portal (SUE) within 60 days; supplementary documentation submitted on 11 September 2026

Note: the outcome of the PAS procedure and the status of the grid connection solution (acceptance and validity) will be confirmed in the data room.
INDICATIVE ECONOMICS

Illustrative specific yield c. 1,750–1,850 kWh/kWp (single-axis trackers with bifacial modules in Central Italy)
Illustrative annual production c. 22–23.5 GWh (year 1)
Illustrative annual revenue c. €1.7–2.0m at an assumed captured price of €75–85/MWh
CAPEX / energy yield report Not included in the documentation received; to be provided in the data room

No energy yield report or cost estimate was provided with the project documents. The figures above are MergersCorp benchmark assumptions for indicative purposes only and are not forecasts.
PROPOSED TRANSACTION & PROCESS

Perimeter

acquisition of 100% of the project company holding the Project’s rights, applications, Terna grid connection solution and land agreements.

Structure

share deal (to be confirmed); consideration and payment terms to be proposed by bidders.

Next steps

execution of a Non-Disclosure Agreement, followed by access to an Information Memorandum and virtual data room, and submission of non-binding indications of interest.

البيانات الأساسية

رقم الإعلان
L#20261189
الدولة
إيطاليا
القطاع
Renewable energy
حالة الصفقة
متاح
السعر المستهدف
السعر عند الطلب
الإيرادات
€1,700,000
EBITDA
سيُعلن لاحقاً
مضاعف الإيرادات
يُحدد لاحقاً
مضاعف EBITDA
يُحدد لاحقاً

استشارات M&A للشركات المتوسطة – Deal Tombstones 2024

مستشارDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

شركات للبيع

فرص مشابهة

المملكة المتحدةالمملكة المتحدةRenewable energyL#20261204

70MW UK Battery Energy Storage System [Q4-2027 RTB]

The UK Battery Energy Storage System (BESS) market offers investment opportunities driven by the growing need for grid flexibility, energy security and the integration of renewable energy sources. Battery storage assets help balance electricity supply and demand, manage fluctuations in…

السعر المستهدف
£4,200,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
المملكة المتحدةالمملكة المتحدةRenewable energyL#20261205

47.5MW UK Battery Energy Storage System [Q4-2027 RTB]

The UK Battery Energy Storage System (BESS) market offers growing opportunities for investors as the country continues to strengthen its electricity infrastructure and integrate renewable energy generation. Battery storage plays an important role in balancing electricity supply and demand, enhancing…

السعر المستهدف
£3,087,500
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
المملكة المتحدةالمملكة المتحدةRenewable energyL#20261203

99.9MW UK Battery Energy Storage System [Q4-2027 RTB]

The UK Battery Energy Storage System (BESS) market presents attractive opportunities for investors as the country continues to expand renewable energy generation and modernise its electricity infrastructure. Battery storage systems play a vital role in balancing electricity supply and demand,…

السعر المستهدف
£7,500,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً