يفتح في علامة تبويب جديدة

69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity

69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity
القطاع
Technology
رقم الإعلان
L#20261211
السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً

الوصف

This Project presents a rare opportunity to acquire a fully infrastructure-loaded legacy steel campus in Weirton, West Virginia, situated along the Ohio River in the heart of the Upper Ohio Valley. The site features over 3.3 million square feet of industrial buildings, six electrical substations, a fully operational water and wastewater treatment plant, on-site natural gas delivery via TC Energy, comprehensive rail access, and an established inventory of spare parts and equipment. Unlike most brownfield redevelopment opportunities, Weirton's existing infrastructure dramatically reduces the capital investment required to bring a new industrial user online. Environmental risks are actively managed through site management planning, targeted demolition, and established regulatory frameworks. The site's scale, infrastructure depth, and trimodal access make it well-suited for advanced manufacturing, data center development, energy transition, logistics, or mixed industrial use.

On-Site Power

  • 69MW
  • Behind the Meter - Power Generation with Approximate Date for In Service: Up to 1.0 GW for "behind the meter" power generation with an in service date of 24-32 months depending on the site development Phase I could be an initial "behind the meter" power with Phase II being the ramp up to 1.0GW or higher. Hyperscale's are looking for 1GM of power "behind the meter" in 36 months.
  • Total Power from Grid Connection: 300MW

Electric Provider: FirstEnergy (MonPower)

  • Six on-site electrical substations - one installed within the past three years
  • Monthly maintenance and inspections have been maintained since plant idling; substations confirmed in good condition by FirstEnergy
  • Replacement cost of substations and transformers estimated to exceed $100 million
  • FirstEnergy has confirmed readiness to advance to DLS and ESA phases, pending end-user power timeline

Buildings & Facilities

  • Warehouse building: 3 million sq ft under roof - excellent structural condition with full utility connections
  • Ceilings: 25-27 ft throughout; robust concrete foundations and high-quality concrete flooring
  • Two additional buildings, each approximately 1 million sq ft, located along the main street - suitable for repurposing
  • Additional structures feature exceptionally high ceilings, powered shells, and substantial concrete foundations
  • Portions of the warehouse are currently leased, generating ongoing revenue

Water

  1. 01
    Process/ Municipal WaterFully operational on-site water/wastewater treatment plant with multiple clarifiers
  2. 02
    Municipal IntegrationFacility supplements the city water supply during shortages via connection to the municipal water system
  3. 03
    Wastewater TreatmentOn-site plant serves both the campus and municipal needs; replacement cost exceeds $200 million

Fiber

  • Established fiber infrastructure on-site as part of a comprehensive municipal utility network
  • Connectivity supports industrial controls, data infrastructure, and broadband buildout

Natural Gas Infrastructure

  • Provider: TC Energy
  • TC Energy 16" pipeline feeds the Strip Mill via a regulation and measurement facility; natural gas pipeline follows the FirstEnergy powerline into the site
  • TC Energy 16" pipeline also feeds the Halfmoon Warehouse via a regulation and measurement facility - the same pipeline as the Strip Mill.
  • Single feed pipeline serving both facilities at 225 psig MOP
  • Capacity: 50 Dth (dekatherms) per day - robust compared to typical industrial sites

Environmental Next Steps

  • Environmental requirements and site management plans will be revised upon completion of the redevelopment design and engineering.
  • Demolition of non-repurposable buildings is expected to reduce environmental liabilities per preliminary site management assessments
  • The redevelopment strategy incorporates eliminating legacy environmental concerns and achieving full regulatory compliance.
  • Brownfield designation provides opportunities for remediation incentives and streamlined development pathways

Asset Summary

  • Scrap value: $28M-$35M (tin, copper, and high-value steel)
  • Spare parts inventory (electric motors, pumps, components): estimated value over $3 million
  • Railroad infrastructure: direct access to Norfolk Southern; estimated value $4-$6 million - transferred with site
  • On-site vehicles and equipment (trucks, vans, tow motors, rail tugs): estimated value $100,000-$200,000
  • Water/wastewater treatment plant replacement cost: exceeds $200 million
  • Electrical substation replacement cost: exceeds $100 million

Railroad Infrastructure

  • Substantial short lines and rail connectors on-site, providing direct access to the Norfolk Southern mainline
  • Norfolk Southern has made recent inquiries regarding asset acquisition - estimated value $4-$6 million.
  • Railroad assets transfer with the property; the buyer determines optimal use or
  • Rail ownership enhances logistical capabilities and site attractiveness to prospective operators

البيانات الأساسية

رقم الإعلان
L#20261211
الدولة
الولايات المتحدة
القطاع
Technology
حالة الصفقة
متاح
السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
مضاعف الإيرادات
يُحدد لاحقاً
مضاعف EBITDA
يُحدد لاحقاً

استشارات M&A للشركات المتوسطة – Deal Tombstones 2024

مستشارDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

شركات للبيع

فرص مشابهة

الولايات المتحدةالولايات المتحدةTechnologyL#20261214

149.8MW Powered-Land Data Center Development

Project represents a powered-land development opportunity in East Texas, strategically located in Grand Saline, Van Zandt County, within the ERCOT electricity market.The project offers approximately 137.5 acres of approved and contracted land, with an additional 108.4 acres identified for potential…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261216

7GW Hyperscale Data Center & Powered Land Development Platform

The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation. The platform combines titled…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261217

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity

Project Racehorse represents a significant opportunity to develop a large-scale AI and hyperscale data center campus on approximately 1,000 acres of industrial land in West Virginia, with potential expansion to approximately 2,000 acres. The project is strategically positioned within the…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261219

500MW Large-Scale Data Center & Power Development

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh. The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter…

السعر المستهدف
$75,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

السعر المستهدف
$200,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

السعر المستهدف
$100,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

السعر المستهدف
$400,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً