يفتح في علامة تبويب جديدة

500MW Large-Scale Data Center & Power Development

500MW Large-Scale Data Center & Power Development
القطاع
Technology
رقم الإعلان
L#20261219
السعر المستهدف
$75,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً

الوصف

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh.

The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter (BTM) power generation facility, access to regional natural gas infrastructure, and nearby high-voltage transmission networks.

The site is being positioned for AI infrastructure, hyperscale data centers, and other energy-intensive industrial applications, with a proposed phased power development strategy.

KEY INVESTMENT HIGHLIGHTS

  1. 01
    Land AreaApproximately 900–1,000 acres reported, with potential expansion subject to verification.
  2. 02
    Initial Power Target500 MW of behind-the-meter generation within a targeted 36-month development period.
  3. 03
    Long-Term Power Potential2 GW+ expansion target, subject to development scope and infrastructure feasibility.
  4. 04
    Strategic LocationOhio River industrial corridor, within the greater Pittsburgh region.
  5. 05
    Natural Gas AccessReported on-site TC Energy / Columbia Gas infrastructure, with additional regional pipeline networks.
  6. 06
    Grid ConnectivitySix nearby 138 kV substations and a 345 kV transmission corridor in the surrounding area.

SITE & DEVELOPMENT POTENTIAL

The property offers a substantial development footprint, reportedly comprising approximately 900–1,000 acres, with potential expansion to 1,500–2,000 acres.

The site is being considered for a large-scale campus development, with a focus on AI and hyperscale data center infrastructure.

The land classification and final transaction boundaries remain subject to confirmation, with site preparation, utilities and generation infrastructure requiring further development.

POWER & ENERGY INFRASTRUCTURE

The proposed energy strategy is centered on a dedicated build-own-operate power generation facility, targeting an initial 500 MW of behind-the-meter capacity within approximately 36 months.

A longer-term expansion target exceeding 2 GW has also been indicated, subject to confirmation of the development scope, generation capacity and delivery milestones.

Additional infrastructure considerations include:

  • Reported 500 MW grid interconnection request, with a Mon Power load study reportedly submitted and pending confirmation of status.
  • Six nearby 138 kV substations.
  • A 345 kV transmission corridor approximately 2.5–3.6 miles south of the site.
  • Reported access to multiple regional natural gas pipeline networks.

UTILITIES & CONNECTIVITY
Natural Gas: Reported on-site TC Energy / Columbia Gas pipeline infrastructure, with regional access to Rover, Nexus and TETCO systems.

Water: Proposed Ohio River cooling-water system with a reported capacity of 150,000 gallons per minute, requiring approximately 12 miles of pipeline infrastructure.

Municipal Utilities: City of New Cumberland potable water and sewer services identified.

Fiber Connectivity: Nearby fiber infrastructure reportedly includes Horizon, Glo and Zayo networks, providing potential connectivity options subject to carrier confirmation.

TRANSACTION OVERVIEW

Item Details
Project Project Racehorse
Location New Cumberland, West Virginia, USA
Indicative Asking Price USD 75,000,000
Reported Land Area Approximately 900–1,000 acres
Initial BTM Power Target 500 MW
Target Development Period Approximately 36 months
Expansion Potential 2 GW+
Transaction Status Early-stage development opportunity

The seller reportedly indicates that proof of funds and escrow placement have been addressed, although supporting documentation and an executed purchase and sale agreement have not been provided for verification. An end-of-year closing target has been indicated.

البيانات الأساسية

رقم الإعلان
L#20261219
الدولة
الولايات المتحدة
القطاع
Technology
حالة الصفقة
متاح
السعر المستهدف
$75,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
مضاعف الإيرادات
يُحدد لاحقاً
مضاعف EBITDA
يُحدد لاحقاً

استشارات M&A للشركات المتوسطة – Deal Tombstones 2024

مستشارDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

شركات للبيع

فرص مشابهة

الولايات المتحدةالولايات المتحدةTechnologyL#20261214

149.8MW Powered-Land Data Center Development

Project represents a powered-land development opportunity in East Texas, strategically located in Grand Saline, Van Zandt County, within the ERCOT electricity market.The project offers approximately 137.5 acres of approved and contracted land, with an additional 108.4 acres identified for potential…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261216

7GW Hyperscale Data Center & Powered Land Development Platform

The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation. The platform combines titled…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261217

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity

Project Racehorse represents a significant opportunity to develop a large-scale AI and hyperscale data center campus on approximately 1,000 acres of industrial land in West Virginia, with potential expansion to approximately 2,000 acres. The project is strategically positioned within the…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

السعر المستهدف
$200,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

السعر المستهدف
$100,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

السعر المستهدف
$400,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261211

69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity

This Project presents a rare opportunity to acquire a fully infrastructure-loaded legacy steel campus in Weirton, West Virginia, situated along the Ohio River in the heart of the Upper Ohio Valley. The site features over 3.3 million square feet of…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً