يفتح في علامة تبويب جديدة

American Pre-Drill Natural Gas & Helium Asset

American Pre-Drill Natural Gas & Helium Asset
القطاع
Energy & Power
رقم الإعلان
L#20261218
السعر المستهدف
السعر عند الطلب
الإيرادات
$160,050,000
EBITDA
$128,040,000

الوصف

This project is an institutional pre-drill exploration program focused on delineating subsurface natural (geological) hydrogen and co-occurring strategic helium systems in the U.S. Gulf Coast basin (Texas). The sponsor is raising $13.5M in staged, milestone-gated capital over an 18 to 19 month exploration lifecycle to convert existing proprietary desktop reconnaissance into 1 to 2 substantiated, drill-ready subsurface targets. This structure isolates pre-drill geologic confirmation from downstream development risk, minimizing dry-hole exposure prior to full-scale drilling and plant capital deployment.

Core Investment Thesis & Strategic Moat

Empirical Field Provenance

The venture’s proprietary predictive geological targeting is backed by direct historical operating leadership on the first benchmark U.S. natural hydrogen exploration well (drilled in Fillmore County, Nebraska in 2019), which logged high-grade wellhead gas tests of 44% hydrogen and 12.8% helium.

Disruptive Cost & Carbon Profile

Natural geologic extraction yields an estimated production cost of $0.50 to $1.00 per kg of hydrogen with an ultra-low carbon intensity (~0.4 kg CO2e per kg of hydrogen), heavily outcompeting both green water-electrolysis ($4.50 to $12.00 per kg) and fossil grey SMR ($1.00 to $3.00 per kg) routes.

High-Margin Helium Kicker

Helium demand in advanced semiconductor manufacturing, quantum computing, cryogenics, and aerospace creates an outsized revenue cushion. Modeled conservatively at an initial 2% concentration by volume and priced at a discount to spot, helium serves as a primary driver of project capital efficiency and early payback.

Texas Jurisdiction & Infrastructure Advantage

Texas provides clear administrative and mineral rights pathways (~1 month / ~$200K acquisition profile), competitive rig mobilization rates, and direct access to heavy industrial offtake clusters (refineries, ammonia, methanol, and chemical complexes) along Gulf Coast distribution corridors.

Capital Tranches & Milestone De-Risking Gates

Pre-drill equity deployment is governed by technical decision gates, releasing capital only upon definitive geologic evidence:

Gate / Phase Duration Capital Primary Scope of Work Unlocked Milestone
Gate 1: Target Selection 3 to 4 months $1.5M Finalize desktop leads, rank prospective acreage, establish initial permitting frameworks. Narrow asset portfolio to 3 to 4 Areas of Interest (AOIs).
Gate 2: Field Validity 6 months $3.0M Mineral licensing across 2 AOIs; surface geochemical soil surveys to test gas migration pathways. Prioritize 1 to 2 AOIs with confirmed surface anomaly signatures.
Gate 3: Drill Readiness 9 months $9.0M 2D/3D geophysics, structural model refinement, shallow strat-hole drilling, FEED/permitting readiness. Deliver 1 to 2 drill-ready structures prepared for exploration drilling financing.
Total Program 18 to 19 months $13.5M Full pre-drill program prior to development-stage underwriting. Drill-ready status achieved.

Project Financial Model (Per Single Commercial Structure)

The financial model below details an illustrative commercial exploitation scenario for one target structure under baseline Texas execution conditions against an upside regional benchmark, incorporating full extraction, separation, and purification surface infrastructure.

Baseline Assumptions & Technical Specifications

Parameter Texas Execution Case California Benchmark Case Basis / Source
Pre-Drill Equity Investment $13.5M $13.5M Program de-risking raise
Commercial Facility CAPEX $150.0M $150.0M Extraction, purification, separation plant
Construction Timeline 4.0 Years 4.0 Years Engineering, procurement, construction
Annual Hydrogen Nameplate Output 25.0 ktpa (25.0M kg) 25.0 ktpa (25.0M kg) High purity grade (99.999%)
Annual Helium Nameplate Output 1.0 ktpa (1.0M kg) 1.0 ktpa (1.0M kg) Ultra-high purity (up to 7N grade)
Delivered Hydrogen Contract Price $3.00 per kg $5.00 per kg Pipeline / regional delivery within ~20 km
Realized Helium Gate Price (EXW) $90.00 per kg $90.00 per kg Significant discount vs. ~$150 per kg market spot
Direct Operating Cost (Hydrogen) $1.00 per kg $1.00 per kg Subsurface natural lift + processing
Direct Operating Cost (Helium) $8.00 per kg $8.00 per kg Separation & liquefaction/storage
Facility Operating Uptime 97.0% 97.0% Base industrial plant availability factor
Discount Rate (Real) 10.5% 10.5% Project weighted average cost of capital

Steady-State Annual Operating Performance (Year 5+)

Reflecting 97% operational availability across both product streams:

Line Item Texas Execution Case California Benchmark Case Notes
Gross Hydrogen Revenue $72.75M $121.25M Based on 24.25M kg sold
Gross Helium Revenue $87.30M $87.30M Based on 0.97M kg sold
Total Net Revenue $160.05M $208.55M Combined multi-gas stream
Direct Hydrogen Operating Costs ($24.25M) ($24.25M) $1.00 per kg produced
Direct Helium Operating Costs ($7.76M) ($7.76M) $8.00 per kg produced
Total Direct Operating Costs ($32.01M) ($32.01M) Field extraction and processing opex
Steady-State EBITDA $128.04M $176.54M Annual cash operating profit
EBITDA Operating Margin 80.0% 84.7% High margin driven by helium co-production

Indicative Multi-Year Project Cash Flow Model (10-Year Snapshot in $M)

Reflecting a 4-year development and construction period followed by steady-state production:

Line Item ($M) Year 1 Year 2 Year 3 Year 4 Year 5 (COD) Year 6 Year 7 Year 8 Year 9 Year 10
Pre-Drill Equity Tranche ($4.50) ($9.00) — — — — — — — —
Facility Construction CAPEX — — ($75.00) ($75.00) — — — — — —
Commercial Revenue (TX Base) — — — — $160.05 $160.05 $160.05 $160.05 $160.05 $160.05
Operating Costs (TX Base) — — — — ($32.01) ($32.01) ($32.01) ($32.01) ($32.01) ($32.01)
Net Operating Cash Flow ($4.50) ($9.00) ($75.00) ($75.00) $128.04 $128.04 $128.04 $128.04 $128.04 $128.04
Cumulative Net Cash Flow ($4.50) ($13.50) ($88.50) ($163.50) ($35.46) $92.58 $220.62 $348.66 $476.70 $604.74

Return Metrics & Sensitivity Summary

Valuation Metric Texas Execution Base Case California Upside Case Sensitivity Notes
Net Present Value (NPV at 10.5%) ~$300M ~$500M Driven by a +$2.00 per kg premium on hydrogen
Internal Rate of Return (IRR) ~38% ~52% Robust downside buffer provided by helium sales
Discounted Payback Period (DPP) ~6.7 Years ~5.7 Years Incorporates the 4-year development phase
Helium Revenue Contribution 54.5% 41.9% Represents ~3.8% of product volume but over half of base revenue

Transaction Structuring & Partnership Terms

Financing Target

$13.5M technical exploration financing.

Entity Structure

Project-level special purpose vehicle (SPV) / asset-level partnership covering the Texas perimeter.

Cap Table Split

  • 80% Project Equity: Allocated to the incoming investor syndicate against $13.5M cash commitments.
  • 20% Sponsor Equity: Held by the management founding entity in consideration of in-kind technical IP, proprietary geological algorithms, and desktop studies.
Syndicate Target

Seeking a lead investor commitment of $3.5M+ to set board governance, pacing, and tranche clearance criteria, supported by participating co-investors and corporate strategics from $1.0M+.

البيانات الأساسية

رقم الإعلان
L#20261218
الدولة
الولايات المتحدة
القطاع
Energy & Power
حالة الصفقة
متاح
السعر المستهدف
السعر عند الطلب
الإيرادات
$160,050,000
EBITDA
$128,040,000
مضاعف الإيرادات
يُحدد لاحقاً
مضاعف EBITDA
يُحدد لاحقاً

استشارات M&A للشركات المتوسطة – Deal Tombstones 2024

مستشارDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

شركات للبيع

فرص مشابهة

كازاخستانكازاخستانEnergy & PowerL#20261198

Polymetallic Exploration Deposit

A portfolio of identified polymetallic mineral occurrences presenting opportunities for further exploration, technical evaluation and potential development. INVESTMENT HIGHLIGHTS Multiple mineral occurrences: Four+ mineralized zones are described in available geological records. Licence area: Records indicate that the occurrences are covered…

السعر المستهدف
$35,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
كازاخستانكازاخستانEnergy & PowerL#20261199

Copper & Polymetallic Exploration Project

An exploration-stage copper and associated polymetallic project in southern Kazakhstan, offering potential for further geological investigation, resource evaluation and future development. Investment Highlights Location: Southern Kazakhstan Copper Resources: 2.1 million tonnes, as reported by the project owner; independent verification required.…

السعر المستهدف
$80,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

السعر المستهدف
السعر عند الطلب
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

السعر المستهدف
$400,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

السعر المستهدف
$100,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً
الولايات المتحدةالولايات المتحدةTechnologyL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

السعر المستهدف
$200,000,000
الإيرادات
يُحدد لاحقاً
EBITDA
سيُعلن لاحقاً