is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom
تعد البرازيل ثاني أكبر منتج للطاقة الكهرومائية في العالم من حيث القدرة المركبة، وتمتلك أكبر قدرة مثبتة للطاقة الكهرومائية في أمريكا الجنوبية، بنسبة 60 في المائة من القدرة الإجمالية للقارة. وتظل الطاقة الكهرومائية الكبيرة المصدر الرئيسي لإمدادات الكهرباء، حيث تمثل طاقة الرياح والطاقة الشمسية حوالي 11 في المائة سنت.
يتم بيع رخصة بناء ومشروع لمحطة طاقة كهرومائية في البرازيل. تقع محطة الطاقة الكهرومائية بقدرة 14.7 ميجاواط في بلديات كابينزال وإبيرا وأورو في ولاية سانتا كاتارينا بالبرازيل، مع الاستفادة من فجوة إجمالية تبلغ 8.33 متر مربع في المكان بين السد ومحطة الطاقة.
النقاط الرئيسية
المرحلة = جاهز للبناء
الطاقة المركبة = 14.70 ميجاوات
متوسط الطاقة = 7.79 متوسط ميجاوات (الفترة من 1940 إلى 2015)
ضمان الطاقة المادية = 7.06 ميجاوات متوسط محسوب للفترة من 1940 إلى 2015 من متوسط التدفقات الشهرية الملحوظة ووفقا للأمر رقم 463/2009 الصادر عن وزارة المناجم والطاقة.
الاتصال بـSIN = سيتم بناء خط النقل (LT) عند 138 كيلو فولت، والذي يسمى الخط الجنوبي، والذي سينقل الطاقة المولدة من PCH Barra do Pinheiro، في اتحاد موقّع بين محطات الطاقة الكهرومائية الصغيرة لنهر Peixe الواقعة بين مصب النهر.
الوضع
تم إصدار إعلان توفر المياه – DRDH (الأمر رقم 0218) من قبل أمانة الدولة للتنمية المستدامة في سانتا كاتارينا في 16 يونيو 2020.
تم إصدار الترخيص البيئي المسبق – LAP من قبل معهد البيئة بولاية سانتا كاتارينا – IMA في 26 نوفمبر 2021.
حاليًا بصدد الحصول على ترخيص التركيب البيئي – LAI والحصول على ترخيص قطع الغطاء النباتي – AuC، من IMA/SC.
تبلغ القدرة الإجمالية لمجاري الصرف الصحي المصممة 6,374 مترًا مكعبًا في الثانية (فيضان الألفية).
محطة الطاقة الملحقة بالسد هي من النوع المحمي وقد تم تصميمها في دراسة تحسين المشروع الأساسي لإيواء ثلاث وحدات توليد أفقية من نوع كابلان إس، بقدرة 4.9 ميجاوات من الطاقة المركبة لكل منها، وتدفق توربيني يبلغ 67.6 متر مكعب في الثانية لكل وحدة وانخفاض إجمالي 8.37 م.
من المتوقع أن تستغرق عملية تنفيذ المشروع 24 شهرًا.
التكلفة المقدرة للاستثمار
تقدر التكلفة الإجمالية لتنفيذ المشروع بمبلغ 106,426,000 ريال برازيلي، شاملاً خط النقل، بدون شركة JDC. ويمثل هذا تكلفة قدرها 7,240.00 ريال برازيلي/كيلوواط، وهي قيمة أقل بكثير من التكلفة القياسية البالغة 8466.52 ريال برازيلي/كيلوواط، والتي حددتها ANEEL لمحطات الطاقة الكهرومائية الصغيرة، وهي قيمة تستخدم لحساب ضمان الامتثال الصادق المطلوب لمنح الامتياز.
لا تشمل تكلفة تنفيذ PCH Barra do Pinheiro الحصول على حقوق المشروع الأساسي المعتمد من قبل ANEEL (DRS-PCH) والتراخيص البيئية، بمبلغ 800,000.00 ريال برازيلي/ميغاواط مثبتة.
من المتوقع أن تستغرق عملية تنفيذ المشروع 24 شهرًا.
is a global brand operating through a number of professional firms and constituent entities located throughout the world to provide M&A Advisory and other client related professional services. The Member Firms are constituted and regulated in accordance with relevant local regulatory and legal requirements. For more details on the nature of our affiliation, please visit us on our website https://mergerscorp.com/disclaimer. MergersCorp M&A International is not a registered broker-dealer under the U.S. securities laws.
This website does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation of any security or any other product or service by MergersUS Inc. or any other third party regardless of whether such security, product or service is referenced in this website. Furthermore, nothing in this website is intended to provide tax, legal, or investment advice and nothing in this website should be construed as a recommendation to buy, sell, or hold any investment or security or to engage in any investment strategy or transaction.MergersCorp M&A International franchising program is not offered to individuals or entities located in the United States
The franchising program is offered by MergersUK Limited a UK Company with registered office at 71-75 Shelton Street, Covent Garden, London, WC2H 9JQ, United Kingdom
This website is operated by MergersUS Inc a US Corporation with registered office at
خطأ: نموذج الاتصال غير موجود.
خطأ: نموذج الاتصال غير موجود.
خطأ: نموذج الاتصال غير موجود.
خطأ: نموذج الاتصال غير موجود.
وصف
تعد البرازيل ثاني أكبر منتج للطاقة الكهرومائية في العالم من حيث القدرة المركبة، وتمتلك أكبر قدرة مثبتة للطاقة الكهرومائية في أمريكا الجنوبية، بنسبة 60 في المائة من القدرة الإجمالية للقارة. وتظل الطاقة الكهرومائية الكبيرة المصدر الرئيسي لإمدادات الكهرباء، حيث تمثل طاقة الرياح والطاقة الشمسية حوالي 11 في المائة سنت.
يتم بيع رخصة بناء ومشروع لمحطة طاقة كهرومائية في البرازيل. تقع محطة الطاقة الكهرومائية بقدرة 14.7 ميجاواط في بلديات كابينزال وإبيرا وأورو في ولاية سانتا كاتارينا بالبرازيل، مع الاستفادة من فجوة إجمالية تبلغ 8.33 متر مربع في المكان بين السد ومحطة الطاقة.
النقاط الرئيسية
المرحلة = جاهز للبناء
الطاقة المركبة = 14.70 ميجاوات
متوسط الطاقة = 7.79 متوسط ميجاوات (الفترة من 1940 إلى 2015)
ضمان الطاقة المادية = 7.06 ميجاوات متوسط محسوب للفترة من 1940 إلى 2015 من متوسط التدفقات الشهرية الملحوظة ووفقا للأمر رقم 463/2009 الصادر عن وزارة المناجم والطاقة.
الاتصال بـSIN = سيتم بناء خط النقل (LT) عند 138 كيلو فولت، والذي يسمى الخط الجنوبي، والذي سينقل الطاقة المولدة من PCH Barra do Pinheiro، في اتحاد موقّع بين محطات الطاقة الكهرومائية الصغيرة لنهر Peixe الواقعة بين مصب النهر.
الوضع
تم إصدار إعلان توفر المياه – DRDH (الأمر رقم 0218) من قبل أمانة الدولة للتنمية المستدامة في سانتا كاتارينا في 16 يونيو 2020.
تم إصدار الترخيص البيئي المسبق – LAP من قبل معهد البيئة بولاية سانتا كاتارينا – IMA في 26 نوفمبر 2021.
حاليًا بصدد الحصول على ترخيص التركيب البيئي – LAI والحصول على ترخيص قطع الغطاء النباتي – AuC، من IMA/SC.
تبلغ القدرة الإجمالية لمجاري الصرف الصحي المصممة 6,374 مترًا مكعبًا في الثانية (فيضان الألفية).
محطة الطاقة الملحقة بالسد هي من النوع المحمي وقد تم تصميمها في دراسة تحسين المشروع الأساسي لإيواء ثلاث وحدات توليد أفقية من نوع كابلان إس، بقدرة 4.9 ميجاوات من الطاقة المركبة لكل منها، وتدفق توربيني يبلغ 67.6 متر مكعب في الثانية لكل وحدة وانخفاض إجمالي 8.37 م.
من المتوقع أن تستغرق عملية تنفيذ المشروع 24 شهرًا.
التكلفة المقدرة للاستثمار
تقدر التكلفة الإجمالية لتنفيذ المشروع بمبلغ 106,426,000 ريال برازيلي، شاملاً خط النقل، بدون شركة JDC. ويمثل هذا تكلفة قدرها 7,240.00 ريال برازيلي/كيلوواط، وهي قيمة أقل بكثير من التكلفة القياسية البالغة 8466.52 ريال برازيلي/كيلوواط، والتي حددتها ANEEL لمحطات الطاقة الكهرومائية الصغيرة، وهي قيمة تستخدم لحساب ضمان الامتثال الصادق المطلوب لمنح الامتياز.
لا تشمل تكلفة تنفيذ PCH Barra do Pinheiro الحصول على حقوق المشروع الأساسي المعتمد من قبل ANEEL (DRS-PCH) والتراخيص البيئية، بمبلغ 800,000.00 ريال برازيلي/ميغاواط مثبتة.
من المتوقع أن تستغرق عملية تنفيذ المشروع 24 شهرًا.
Basic Details
Target Price:
$3,500,000
Gross Revenue
يحدد لاحقاً
EBITDA
يحدد لاحقاً
Business ID:
L#20230500
التفاصيل
Similar Businesses
Published on أكتوبر 3, 2023 في 2:02 م. تحديث في أكتوبر 3, 2023 في 2:03 م
محطة توليد طاقة كهرومائية بقدرة 10 ميجاواط
$5,000,000
محطات توليد الطاقة, محطات توليد الطاقة
محطة الطاقة الشمسية الكهروضوئية الإيطالية بقدرة 7.50 ميجاوات
€1,700,000
محطات توليد الطاقة
مجموعة من 3 محطات طاقة مائية جديدة تمامًا [حوالي 200 ميجاواط]
$325,000,000
محطات توليد الطاقة, محطات توليد الطاقة
خط أنابيب HPP لخمسة محطات طاقة كهرومائية إيطالية
يحدد لاحقاً
محطات توليد الطاقة
محطات الطاقة الشمسية الكهروضوئية في الولايات المتحدة الأمريكية [13،7 جيجاوات]
$155,000,000
محطات توليد الطاقة, محطات توليد الطاقة, محطة توليد الكهرباء
8.24 ميجاوات محطة للطاقة الشمسية مع اتفاقية شراء الطاقة موقعة مع الحكومة
$9,500,000
Manufacturing, Manufacturing, محطات توليد الطاقة, تصنيع, محطات توليد الطاقة, محطة توليد الكهرباء
PREVIOUS PROPERTY
محطة توليد طاقة كهرومائية بقدرة 33 ميجاواط و4x HPP
NEXT PROPERTY
نادي كرة القدم الجورجي المحترف